West10 fabrication LLC

Serves Lake Oswego, OR

35244

Hired 16 times

2 employees

3 years in business

Not yet available

5.0

This pro accepts payments via Apple Pay, Cash, and Check.

Next Service

Credentials

Background Check

Weston Leverich 
Completed on 6/4/2024 

Show More

Introduction

Small fabrication shop with wide capabilities. CNC products. Forming, straightening. Product design and fabrication. Serving both commercial and residential projects. Vast knowledge in conveyor systems. transfer tables, conveyor shoot designs, AR ware plates. Our shop produces some of the highest quality handmade handrail in the area. Everything fabricated in the house. Not some weak premade kits, like some of my competitors. We can design a truly unique handrail to suit any style you would like. Serving Portland and surrounding areas. Give us a call today to set up your next project.

Show More

Q&A

What should the customer know about your pricing (e.g., discounts, fees)?

unfold fold
My pricing is normally T&M(time and material) I always give detailed bid that will show all pricing of material and work to be performed for you to verify. Sent via email

What is your typical process for working with a new customer?

unfold fold
New customers I prefer to meet in person and go over the landscape of Work really put eyes on the area and project. Workout ideas together.

What education and/or training do you have that relates to your work?

unfold fold
Have many certifications in different wire, wire sizes, steel alloys, in different positions G3, 8G, fracture critical. both mild steel stainless steel MIG, stick, and TIG welding in stainless steel. I have a lifetime of working the trade. I’m very familiar with laws and regulations for both residential and commercial. Have done lots of work for both.

How did you get started doing this type of work?

unfold fold
My father was a steel fabricator, so I grew up around the trade I have been doing it my whole life.

What types of customers have you worked with?

unfold fold
Both residential and commercial

Describe a recent project you are fond of. How long did it take?

unfold fold
Always love doing something unique bring on your art project. Let me show off my artistic side. A recent project I just finished about 250 feet of handrail all seamless, no bolted connections. flat black paint with stainless steel wire rope. Exact color match to the new fencing they put around their house and trim accents on the house. Gave their backyard a real stylish look. Took about four weeks from start of fabrication to end of installation.

What advice would you give a customer looking to hire a provider in your area of work?

unfold fold
Ask them if they have experience in the project you want done. a lot of fabricators have focused on one area of steelwork they’re whole life. For example, someone who has done structural steel for their whole trade would have no idea what laws and regulations would be required for handrail. Someone who only has experience doing home projects, such as handrail would not know weld procedures and fundamentals for something more structural.

Favorites

Here is a brief description text of the drawer.